4.3 Article

A Modified Biogeography-Based Optimization for the Flexible Job Shop Scheduling Problem

期刊

MATHEMATICAL PROBLEMS IN ENGINEERING
卷 2015, 期 -, 页码 -

出版社

HINDAWI LTD
DOI: 10.1155/2015/184643

关键词

-

资金

  1. scientific research startup fund - Shanghai Dianji University
  2. Climbing Peak Discipline Project of Shanghai Dianji University [15DFXK01]

向作者/读者索取更多资源

The flexible job shop scheduling problem (FJSSP) is a practical extension of classical job shop scheduling problem that is known to be NP-hard. In this paper, an effective modified biogeography-based optimization (MBBO) algorithm with machine-based shifting is proposed to solve FJSSP with makespan minimization. The MBBO attaches great importance to the balance between exploration and exploitation. At the initialization stage, different strategies which correspond to two-vector representation are proposed to generate the initial habitats. At global phase, different migration and mutation operators are properly designed. At local phase, a machine-based shifting decoding strategy and a local search based on insertion to the habitat with best makespan are introduced to enhance the exploitation ability. A series of experiments on two well-known benchmark instances are performed. The comparisons between MBBO and other famous algorithms as well as BBO variants prove the effectiveness and efficiency of MBBO in solving FJSSP.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据