4.7 Article

Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 26, 期 1, 页码 401-410

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2010.2048345

关键词

Mixed-integer linear programming; probabilistic security; reserve; unit commitment; wind power

资金

  1. Natural Sciences and Engineering Research Council of Canada
  2. WESNet

向作者/读者索取更多资源

This paper proposes a new unit commitment (UC) formulation for a power system with significant levels of wind generation. The proposed scheme departs from existing unit commitments in that it explicitly models the day-ahead predicted residual demand probability density function (PDF) including the effect of wind power curtailment. This PDF is then used to define a constraint on the probability of the residual demand exceeding the scheduled reserve, which is imposed in addition to the standard N-1 deterministic security criterion. This hybrid probabilistic/deterministic form maintains the mixed-integer linear structure that makes the proposed UC compatible with highly efficient commercially available solvers. Numerical examples illustrate the economical and technical benefits obtained by systematically including wind curtailment as decisions variables in the UC. In addition, the paper computes the hourly day-ahead UC schedule over the course of one year for a typical power system to illustrate the impact of wind power penetration on measures such as operation costs, incremental costs, emission levels, on/off unit switching operations, and reserve levels.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据