4.7 Article

Introduction to Loss-Hedging Financial Transmission Rights

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 24, 期 2, 页码 621-630

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2009.2016494

关键词

Auction; auction revenue right; congestion hedging; financial transmission rights; locational marginal price; loss hedging; revenue adequacy

向作者/读者索取更多资源

In order to guard forward contracts from the locational marginal price (LMP) volatility, financial transmission rights (FTRs) are issued in the centralized power markets. However, the current FTR system can provide hedge only against the congestion components of LMP differentials. Consequently, the loss components remain unhedged. To bridge the gap, a framework is developed in this paper to implement an FTR system that will provide hedge against the loss prices. The availability of loss-hedging FTRs in addition to the congestion hedging FTRs further reduces the exposure of the forward market participants to the LMP volatility. The loss-hedging framework developed is carefully designed to fit the practical environment. All the primary issues for the implementation of loss-hedging FTRs, such as the revenue adequacy test, auction, and auction revenue rights, are carefully addressed. Revenue adequacy of loss-hedging FTRs can be ensured by means of a test called as the offset capacity test. Some efficient policies are also designed for the successful functioning of loss-hedging FTRs. At the end of the paper, a case study is carried out to assess the effectiveness of the methodology developed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据