4.5 Article

Beyond Managing Uncertainty: Insights From Studying Equivocality in the Fuzzy Front End of Product and Process Innovation Projects

期刊

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
卷 58, 期 3, 页码 551-563

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TEM.2010.2095017

关键词

Equivocality; fuzzy front end; predevelopment; process innovation; product innovation; uncertainty

资金

  1. Swedish Governmental Agency VINNOVA

向作者/读者索取更多资源

Previous research has shown uncertainty reduction to be critical in the fuzzy front end of the innovation process, but little attention has been given to the equally important concept of equivocality, although it is a defining characteristic of many front-end projects. To address this research gap, this paper report the results from a longitudinal, multiple case study of four large companies oriented to both product and process innovation. First, our results show that both uncertainty and equivocality is more effectively reduced in successful front-end projects than in unsuccessful ones. Second, the negative consequences of equivocality appear more critical to front-end performance than the consequences following uncertainty. Third, our results show that uncertainty and equivocality are reduced sequentially in successful projects and simultaneously in unsuccessful projects. Finally, uncertainty and equivocality takes longer time to reduce in process innovation projects than in product innovation projects, which is a consequence of the systemic nature of process innovation. Altogether, these findings provide strong implications for managing front-end projects more proficiently.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据