期刊
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
卷 58, 期 3, 页码 551-563出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TEM.2010.2095017
关键词
Equivocality; fuzzy front end; predevelopment; process innovation; product innovation; uncertainty
资金
- Swedish Governmental Agency VINNOVA
Previous research has shown uncertainty reduction to be critical in the fuzzy front end of the innovation process, but little attention has been given to the equally important concept of equivocality, although it is a defining characteristic of many front-end projects. To address this research gap, this paper report the results from a longitudinal, multiple case study of four large companies oriented to both product and process innovation. First, our results show that both uncertainty and equivocality is more effectively reduced in successful front-end projects than in unsuccessful ones. Second, the negative consequences of equivocality appear more critical to front-end performance than the consequences following uncertainty. Third, our results show that uncertainty and equivocality are reduced sequentially in successful projects and simultaneously in unsuccessful projects. Finally, uncertainty and equivocality takes longer time to reduce in process innovation projects than in product innovation projects, which is a consequence of the systemic nature of process innovation. Altogether, these findings provide strong implications for managing front-end projects more proficiently.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据