Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express

期刊

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
卷 56, 期 2, 页码 243-256

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TEM.2009.2016042

关键词

Delay analysis; high-speed railway; mega project; project management; schedule delays

资金

  1. National Research Foundation of Korea [과C6A1704] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

向作者/读者索取更多资源

In 2004, Korea became the fifth country in the world to own and operate a high-speed railway called Korea Train express (KTX). Numerous uncertainties and challenges during planning and managing phase resulted in schedule delays and cost overruns. The delay causes of each activity along the 412 km Korea high-speed railway route were very difficult to identify because KTX project consisted of 11141 different activities. This paper evaluates challenges, obstacles, and performances of KTX project. First, critical sections in the railway route that influenced significant delays to project completion were identified. Then, delay causes of these critical sections were investigated thoroughly. The analysis discovered five major delay causes for KTX project. They are lack of owner's abilities and strategies to manage hi-tech oriented mega project; frequent changes of routes triggered by conflicts between public agencies and growing public resistance from environmental concerns; the inappropriate project delivery system; a lack of proper scheduling tool tailored for a linear mega project; and redesign and change orders of main structures and tunnels for high-speed railway, which is fundamentally different from the traditional railway construction. Based on the in-depth analysis of KTX project, through which a conceptual framework was established to identify the various facets of mega projects, this paper suggests lessons learned for engineers to better prepare and respond to potential causes of schedule delays for mega projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据