Alternative Fuels Infrastructure Facility - Co-funding Rate

基金名称
Alternative Fuels Infrastructure Facility - Co-funding Rate
资助机构
Connecting Europe Facility (CEF)
European Commission
截止日期
2024-09-24
基金规模
€780000000
申请资格


Conditions


1. Admissibility conditions: described in section 5 of the call document


Proposal page limits and layout: described in Part B of the Application Form available in the Submission System


2. Eligible countries: described in section 6 of of the call document


3. Other eligibility conditions: described in section 6 of the call document


4. Financial and operational capacity and exclusion: described in section 7 of the call document


5. Evaluation and award:


  • Award criteria, scoring and thresholds: described in section 9 of the call document



  • Submission and evaluation processes: described section 8 of the call document and the Online Manual



  • Indicative timeline for evaluation and grant agreement: described in section 4 of the call document



6. Legal and financial set-up of the grants: described in section 10 of the call document


Documents



Call documents:


Call document CEF-T-2024-AFIFGEN



Application form and annexes:


Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic Page - these are only for information)


Application form (Part A and B)


Detailed budget table per WP


Timetable (Gantt Chart)


Letter of support (MS agreement)


Environmental compliance file


Financial approval letter (IP)


Financial approval letter (non-IP)


Simplified CBA calculator (CEF-T)



List of Implementing Partners



Model Grant Agreement:


CEF Model Grant Agreement MGA


Additional documents:


CINEA guide on economic appraisal for CEF-T transport projects


Work Programme 2021-2027 (CEF-T)


CEF Regulation 2021/1153


TEN-T Regulation 1315/2013


EU Financial Regulation 2018/1046


基金编号
CEF-T-2024-AFIFGEN-COSTS
说明
Objective:

The objective is to support the deployment of Alternative Fuel supply infrastructure, contributing to decarbonising transport along the TEN-T network.


Scope:

The following Actions will be supported:

  • Actions supporting the deployment of electricity recharging infrastructure for Heavy-Duty Vehicles, equipped with recharging points of respectively minimum 150kW, 350kW and 1MW power output.
  • Actions supporting the roll-out of hydrogen refuelling infrastructure for Heavy-Duty Vehicles.
  • Actions supporting the roll-out of hydrogen refuelling infrastructure for public transport in bus depots for railways on sections of the TEN-T rail network for which a derogation from the electrification requirement has been granted and on isolated networks, in line with the applicable TEN-T Regulation, or in terminals for refuelling shunting locomotives.
  • Actions supporting the roll-out of hydrogen refuelling and electricity recharging infrastructure dedicated to inland waterway and maritime vessels, vessels, vehicles and equipment for port operations and airports.
  • Actions supporting the deployment of bunkering infrastructure for ammonia supply to maritime and inland waterway vessels and vessels for port operations for TEN-T maritime ports and inland ports.
  • Actions supporting the deployment of bunkering infrastructure for methanol supply to maritime and inland waterway vessels and vessels for port operations for TEN-T maritime ports and inland ports.

Costs related to vehicles or vessels will not be eligible, except for vessels in the case of inland waterway and short sea shipping, if an initial number of vessels is needed to kick-start the use of the supported recharging/refuelling infrastructure. In such case, the eligible cost shall be limited to the difference of cost between a fossil-fuel vessel and the zero-emission vessel(s).

Costs related to the production of green hydrogen for the purpose of transport will be eligible as synergetic elements under the conditions specified in Section 10.6 of the Work Programme.

基金资源

Purdue Grant Writing Lab: Introduction to Grant Writing 打开链接
University of Wisconsin Writing Center: Planning and Writing a Grant Proposal 打开链接

快速分享


将截止日期添加到日历

2024-09-24

你有想要在此列出的基金申报机会吗?

立即提交你的基金合作意向,发送至 support@peeref.com,我们会尽快为你审核。


Publish scientific posters with Peeref

Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.

Learn More

Create your own webinar

Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.

Create Now

相关基金

'Innovate to transform' support for SME's sustainability transition (CSA)
Social sciences and humanities 2024-07-31 €2265000
Strategic Nature Projects
N/A 2024-09-05 €70000000
Valorisation of polluted/contaminated wood from industrial and post-consumer waste streams
Civil engineering, maritime/hydraulic en... 2024-09-18 €213680072
Alternative Fuels Infrastructure Facility - Co-funding Rate
N/A 2024-09-24 €220000000
Experimentation and exchange of good practices for value creation
Digital Agenda 2024-09-25 €2000000
Secure waveform for satellite communications
N/A 2024-11-05 €25000000
Defence multi-dimensional communication standard
N/A 2024-11-05 €25000000
COVID-19 Local Roads and Community Infrastructure Program (Phase 2) Guidelines
Local Government 31-Dec-2024 $1,000,000,000.00
CCU for the production of fuels
RePowerEU 2025-01-21 €15000000
Defense Security Cooperation University - Research Grants
Science and Technology and other Researc... Aug 07, 2028 12:00:00 AM EDT 800000