Related references
Note: Only part of the references are listed.From preemptive to non-preemptive speed-scaling scheduling
Evripidis Bampis et al.
DISCRETE APPLIED MATHEMATICS (2015)
Flow shop scheduling with peak power consumption constraints
Kan Fang et al.
ANNALS OF OPERATIONS RESEARCH (2013)
Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency
Joon-Yung Moon et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
Non-preemptive speed scaling
Antonios Antoniadis et al.
JOURNAL OF SCHEDULING (2013)
Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
Sumit Mitra et al.
COMPUTERS & CHEMICAL ENGINEERING (2012)
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Kan Fang et al.
JOURNAL OF MANUFACTURING SYSTEMS (2011)
Energy-Efficient Algorithms
Susanne Albers
COMMUNICATIONS OF THE ACM (2010)
New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost
Pedro M. Castro et al.
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH (2009)
Energy consumption reduction technology in manufacturing - A selective review of policies, standards, and research
Cheol-Woo Park et al.
INTERNATIONAL JOURNAL OF PRECISION ENGINEERING AND MANUFACTURING (2009)
Optimal packet-to-slot assignment in mobile telecommunications
Paolo Detti et al.
OPERATIONS RESEARCH LETTERS (2009)
Energy-Efficient Algorithms for Flow Time Minimization
Susanne Albers et al.
ACM TRANSACTIONS ON ALGORITHMS (2007)
Operational methods for minimization of energy consumption of manufacturing equipment
Gilles Mouzon et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2007)
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
C Subai et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
Power: A first-class architectural design constraint
T Mudge
COMPUTER (2001)