Overview and status of ITER internal components

Journal

FUSION ENGINEERING AND DESIGN
Volume 89, Issue 7-8, Pages 890-895

Publisher

ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2014.01.055

Keywords

ITER; Divertor; Blanket System

Ask authors/readers for more resources

The internal components of ITER are one of the most design and technically challenging components of the ITER machine, and include the Blanket System and the Divertor. The Blanket System successfully went through its Final Design Review in April 2013 and now it is entering into the procurement phase. The design and qualification of the Divertor with a full-tungsten armour was successfully completed and this enabled the decision in November 2013 to start operation with this material option. This paper summarizes the engineering design, the R&D, the technology qualification and procurement status of the Blanket System and of the Divertor of the ITER machine. (c) 2014 ITER Organization. Published by Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available