4.5 Article Proceedings Paper

Main maintenance operations for Test Blanket Systems in ITER TBM port cells

Journal

FUSION ENGINEERING AND DESIGN
Volume 88, Issue 9-10, Pages 2417-2421

Publisher

ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2013.05.081

Keywords

Breeding Blanket; TBM; TBS; ITER

Ask authors/readers for more resources

Each Test Blanket System in ITER is formed by an in-vessel component, the Test Blanket Module, and several associated ancillary systems (coolant and Tritium systems, instrumentation and control systems). The paper describes the overall replacement/maintenance strategy and the main maintenance tasks that have to be considered in the design of the systems. It shows that there are no critical issues. (C) 2013 ITER Organization. Published by Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available