Prediction of backbreak in open-pit blasting using fuzzy set theory

Journal

EXPERT SYSTEMS WITH APPLICATIONS
Volume 37, Issue 3, Pages 2637-2643

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2009.08.014

Keywords

Backbreak; Regression model; Fuzzy model; Gol-E-Gohar iron mine

Ask authors/readers for more resources

Although blasting is the most principal method of fragmentation in hard rock mining, the significance of the costs of blast induced rockmass damage in terms of mining efficiency and safety is becoming increasingly recognized. Backbreak is one of the adverse phenomena in blasting operations that causes the instability of mine walls, failing down of equipments, improper fragmentation, reduced efficiency of drilling, etc., and consequently increases the total cost of a mining operation. In this paper, predictive models based on fuzzy set theory and multivariable regression have been developed for predicting backbreak in Gol-E-Gohar iron mine of Iran. To evaluate performance of the employed models, the coefficient of correlation (R-2) and the root mean square error (RMSE) indices were calculated. It was concluded that performance of the fuzzy model is considerably better than regression model. For the fuzzy and regression models, R-2 and RMSE were equal to 95.43% and 0.44 and 34.08% and 1.63, respectively. The fuzzy model sensitivity analysis shows that the most effective parameters on backbreak phenomenon are stemming length, hole depth, burden and hole spacing. Application of this model in the Gol-E-Gohar iron mine considerably minimized backbreak and improved blasting efficiency. (C) 2009 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available