3.9 Article

Method for the reduction of in-service instrument transformer explosions

Journal

EUROPEAN TRANSACTIONS ON ELECTRICAL POWER
Volume 20, Issue 7, Pages 927-937

Publisher

JOHN WILEY & SONS LTD
DOI: 10.1002/etep.375

Keywords

instrument transformer; failure; explosion; test; internal arc; Weibull distribution

Ask authors/readers for more resources

The methodology and test procedure for the reduction of possible in-service explosions of instrument transformers to negligibly low values is described. As the introduction, an interpretation of statistical results of a survey about different types of failure in instrument transformers is Oven, showing that about 90% of them develop gradually, taking from several hours to several months. The International Electrotechnical Commission (IEC) is about to adopt a standardised procedure requiring that instrument transformers should withstand the effect of an internal arc. The authors are taking a critical view of the proposal; explaining its main flaws. On the basis of calculations and experimental research on models and 123 kV current transformer it is shown that the mechanism causing explosions of instrument transformers cannot be simulated well enough in the way provided for in the draft of the new IEC standard. A new concept for the reduction of explosions of instrument transformers in service called, 'explosion safe' is proposed. It includes additional routine and special tests, and usage of devices for the detection or measurement of oil pressure se in transformers. The proposed tests are based on the investigation 'Volt-Time Relationships for PD Inception in Oil-Paper Insulation'. Copyright (C) 2009 John Wiley & Sons, Ltd.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.9
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available