4.7 Article

Workforce routing and scheduling for electricity network maintenance with downtime minimization

Journal

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Volume 231, Issue 1, Pages 210-228

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2013.05.021

Keywords

OR in energy; Maintenance; Downtime minimization; Routing; Scheduling

Ask authors/readers for more resources

We investigate a combined routing and scheduling problem for the maintenance of electricity networks. In electricity networks power lines must be regularly maintained to ensure a high quality of service. For safety reasons a power line must be physically disconnected from the network before maintenance work can be performed. After completing maintenance work the power line must be reconnected. Each maintenance job therefore consists of multiple tasks which must be performed at different locations in the network. The goal is to assign each task to a worker and to determine a schedule such that the downtimes of power lines and the travel effort of workers are minimized. For solving this problem, we combine a Large Neighborhood Search meta-heuristic with mathematical programming techniques. The method is evaluated on a large set of test instances which are derived from network data of a German electricity provider. (C) 2013 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available