4.2 Article

Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times

Journal

EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
Volume 6, Issue 4, Pages 474-496

Publisher

INDERSCIENCE ENTERPRISES LTD
DOI: 10.1504/EJIE.2012.047666

Keywords

scheduling; bi-criteria; sequence-dependent family setup times; SDFSTs; flowshop manufacturing cell

Funding

  1. National Science Council of the Republic of China (Taiwan) [NSC 99-2410-H-182-023-MY2, NSC 99-2628-E-027-003]

Ask authors/readers for more resources

Flowshop manufacturing cell scheduling problems (FMCSPs) with sequence-dependent family setup times (SDFSTs) have become a key area in the field of scheduling. Though the need to consider multiple criteria in real-world scheduling is widely recognised, most of the currently available algorithms for FMCSPs with SDFSTs only deal with the optimisation of a single performance criterion. In this study, a two-level multi-start simulated annealing (TLMSA) heuristic was presented for this problem with the objectives of simultaneously minimising makespan and total flow time (or total tardiness). To validate the performance of the proposed approach, the obtained sets of non-dominated solutions were evaluated by seven multi-objective performance indicators. The computational results showed that the proposed TLMSA significantly outperforms the benchmark algorithm in terms of the seven performance indicators. It is believed that it can serve as a new benchmark approach for future research on the two FMCSPs with SDFSTs addressed in this study. [Received 15 January 2010; Revised 20 May 2010; 15 November 2010; Accepted 24 February 2011]

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.2
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available