4.8 Article

High Rate Nitrogen Removal in an Alum Sludge-Based Intermittent Aeration Constructed Wetland

Journal

ENVIRONMENTAL SCIENCE & TECHNOLOGY
Volume 46, Issue 8, Pages 4583-4590

Publisher

AMER CHEMICAL SOC
DOI: 10.1021/es204105h

Keywords

-

Funding

  1. Irish state Department of Agriculture, Fisheries and Food [RSF 07-529]

Ask authors/readers for more resources

A new development on treatment wetland technology for the purpose of achieving high rate nitrogen removal from high strength wastewater has been made in this study. The laboratory scale alum sludge-based intermittent aeration constructed wetland (AlS-IACW) was integrated with predenitrification, intermittent aeration, and step-feeding strategies. Results obtained from 280 days of operation have demonstrated extraordinary nitrogen removal performance with mean total nitrogen (TN) removal efficiency of 90% under high N loading rate (NLR) of 46.7 g N m(-2) d(-1). This performance was a substantial improvement compared to the reported TN removal performance in literature. Most significantly, partial nitrification and simultaneous nitrification denitrification (SND) via nitrite was found to be the main nitrogen conversion pathways in the AlS-IACW system under high dissolved oxygen concentrations (3-6 mg L-1) without specific control. SND under high dissolved oxygen (DO) brings high nitrogen conversion rates. Partial nitrification and SND via nitrite can significantly reduce the demand for organic carbon compared with full nitrification and denitrification via nitrate (up to 40%). Overall, these mechanisms allow the system to maintaining efficient and high rate TN removal even under carbon limiting conditions.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available