4.6 Article

A case study on the behavior of shield tunneling in sandy cobble ground

Journal

ENVIRONMENTAL EARTH SCIENCES
Volume 69, Issue 6, Pages 1891-1900

Publisher

SPRINGER
DOI: 10.1007/s12665-012-2021-4

Keywords

Shield-driven tunnel; Settlements; EPB; Numerical simulation; FEM

Funding

  1. National Basic Research Program of China (973 Program) [2011CB013800]
  2. Shanghai Tunneling Engineering Co., Ltd.
  3. Shanghai Shentong Metro Co., Ltd.
  4. Program for Changjiang Scholars and Innovative Research Team in University (PCSIRT) [IRT1029]

Ask authors/readers for more resources

This study investigates the behavior of shield tunneling based on a complete case record of an excavation in sandy cobble ground. Both numerical and analytical analyses were conducted to estimate the surface displacement along the tunnel axis and the surface-zone affected by the shield tunneling. This paper presents the performance of the Peck method in forecasting the transversal surface settlement trough caused by the shield tunneling in a sandy cobble layer. In particular, this study has made a comparison with the vertical surface displacement monitored during the advancing excavation to the settlements estimated by using the Peck method and by conducting a three-dimensional finite element analysis. The effective measures to provide the necessary face support pressure and to reduce the formation of sinkholes and ground settlements in sandy cobble ground were also investigated and discussed.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available