4.7 Article

Thermodynamic and exergoeconomic analysis of a cement plant: Part II - Application

Journal

ENERGY CONVERSION AND MANAGEMENT
Volume 79, Issue -, Pages 799-808

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.enconman.2013.11.054

Keywords

Cement; Energy; Exergy; Exergoeconomics; Efficiency

Funding

  1. Scientific Research Projects Unit (GUBAP) at the University of Gaziantep

Ask authors/readers for more resources

This paper is Part 2 of the study on the thermodynamic and exergoeconomic analysis of a cement plant. In Part I, thermodynamic and exergoeconomic formulations and procedure for such a comprehensive analysis are provided while this paper provides an application of the developed formulation that considers an actual cement plant located in Gaziantep, Turkey. The overall energy and exergy efficiencies of the plant is found to be 59.37% and 38.99% respectively. The exergy destructions, exergetic cost allocations, and various exergoeconomic performance parameters are determined by using the exergoeconomic analysis based on specific exergy costing method (SPECO) for the entire plant and its components. The specific unit exergetic cost of the farine, clinker and cement produced by the cement plant are calculated to be 43.77 USD/GJ, 133.72 USD/GJ and 180.5 USD/GJ respectively. The specific manufacturing costs of farine, clinker and cement are found to be 3.8 USD/ton, 33.11 USD/ton and 41.84 USD/ton respectively. (C) 2013 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available