4.7 Article

Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining

Journal

ENERGY CONVERSION AND MANAGEMENT
Volume 65, Issue -, Pages 616-627

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.enconman.2012.08.024

Keywords

Short-term; Optimal operation; Cascade hydropower stations; Operation rule; Culture algorithm; Data mining

Funding

  1. National Natural Science Foundation of China [51109156]
  2. Program for Changjiang Scholars and Innovative Research Team in University [IRT0851]
  3. Specialized Research Fund for the Doctoral Program of Higher Education [20100032120048]
  4. Science Fund for Creative Research Groups of the National Natural Science Foundation of China [51021004]

Ask authors/readers for more resources

Information hidden in the characteristics and relationship data of a cascade hydropower stations can be extracted by data-mining approaches to be operation rules and optimization support information. In this paper, with Three-gorge and Gezhouba cascade hydropower stations as an example, two operation rules are proposed due to different operation efficiency of water turbines and tight water volume and hydraulic relationship between two hydropower stations. The rules are applied to improve optimization model with more exact decision and state variables and constraints. They are also used in the population initiation step to develop better individuals with culture algorithm with differential evolution as an optimization method. In the case study, total feasible population and the best solution based on an initial population with an operation rule can be obtained with a shorter computation time than that of a pure random initiated population. Amount of electricity generation in a dispatch period with an operation rule also increases with an average increase rate of 0.025%. For a fixed water discharge process of Three-gorge hydropower station, there is a better rule to decide an operation plan of Gezhouba hydropower station in which total hydraulic head for electricity generation is optimized and distributed with inner-plant economic operation considered. (C) 2012 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available