4.5 Article

Channel and floodplain sediment dynamics in a reach of the tropical meandering Rio Beni (Bolivian Amazonia)

Journal

EARTH SURFACE PROCESSES AND LANDFORMS
Volume 35, Issue 15, Pages 1838-1853

Publisher

WILEY
DOI: 10.1002/esp.2065

Keywords

meander; floodplain construction; sediment budget; Beni River; Amazonia

Funding

  1. Institut de Recherche pour le Developpement, France
  2. SENAMHI: National Meteorology and Hydrology Department of Bolivia
  3. Universidad Major San Andres, La Paz
  4. Centre National de la Recherche Scientifique et Institut des Sciences de l'Univers, France
  5. Centre National de la Recherche Scientifique
  6. Laboratoire de Geographie Physique (CNRS, France)

Ask authors/readers for more resources

The study investigates interactions, water and sediment exchanges, between a rapidly migrating meander and its associated floodplain at fine temporal and spatial scales. The Beni River, an Amazonian free meandering river, makes the transition between Andean ranges and Amazonian lowlands. For the period 2002-2006, an assemblage of tools and methods (water and sediment discharges, topometric and bathymetric surveys, sedimentation rate estimations from unsupported Pb-210 and sediment trapping system) was used to jointly analyse the influence on the sediment budget of external factors (mainly water and sediment discharge) and the inherent behaviour of the system. The main issue addressed is the investigation of the complex relationship between 'morphological conditioning' of fluvial landform and process. The first part of the study was undertaken with the aim of linking erosion-deposition in an active meander with water and sediment fluxes. The three inter-annual evolutions are characterized by very unequal sediment budgets; the first two intervals underwent predominant erosion, and the latter slight accumulation. Digital elevation models, evaluated for the active meander, demonstrate that sedimentation on the point bar depends more on external factors than erosion of the concave bank, which fluctuates slightly. The second part of the study, focusing on water and sediment exchanges between active bend and floodplain, examines the respective parts played by overbank flow and by an abandoned channel on the diffusion and sequestration of sediment. The association of short-and long-term estimation of sedimentation rates suggests that floodplain construction is associated with two different processes and rhythms of sediment transportation. Finally, a sediment budget is proposed for the Beni River in the upper part of the Amazonian lowlands. Copyright (c) 2010 John Wiley & Sons, Ltd.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available