4.7 Article Proceedings Paper

High-rate nitrogen removal in a two-stage subsurface vertical flow constructed wetland

Journal

DESALINATION
Volume 246, Issue 1-3, Pages 55-68

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.desal.2008.02.037

Keywords

Nitrogen removal; Surface area requirement; Two-stage constructed wetland system; Vertical flow

Ask authors/readers for more resources

A two-stage constructed wetland (CW) system consisting of two vertical flow (VF) beds with intermittent loading operated in series has been investigated. The first stage uses sand with a grain size of 2-3.2 mm for the main layer and has a drainage layer that is impounded; the second stage uses sand with a grain size of 0.06-4 mm and a conventional drainage layer. The two-stage system was operated with an organic load of 40 g COD m(-2) d(-1) for the whole system, that is with a specific surface area requirement of 2m(2) per person equivalent. The system was operated over a period of 2 years including two full winter seasons. No operational problems occurred, and the Austrian effluent standards for organic matter and ammonium nitrogen could be met during the whole investigation period. Additionally, average nitrogen removal efficiencies of 53% and average nitrogen elimination rates of 2.7 g Nm(-2) d(-1) and 986 g Nm(-2) yr(-1), respectively, could be achieved without recirculation, thus allowing construction with energy-free loading systems. It can be concluded that a better effluent quality can be reached with such two-stage systems as compared to a conventional single-stage VF CW system with intermittent loading, even if the two-stage system is loaded with the double organic load and therefore has only half of the specific surface area requirement.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available