4.7 Article

Integrated maintenance and control policy based on quality control

Journal

COMPUTERS & INDUSTRIAL ENGINEERING
Volume 58, Issue 3, Pages 443-451

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2009.11.002

Keywords

Quality control; Preventive maintenance; Buffer stock

Ask authors/readers for more resources

In this paper, we develop a joint quality control and preventive maintenance policy for a production system producing conforming and non-conforming units. The considered system consists of one machine which must supply another production line operating on a just-in-time basis. According to the proportion I of non-conforming units observed on each lot and compared to a threshold value I(m), one decides to undertake or not maintenance actions on the system. In order to palliate perturbations caused by the stopping of the machine to undergo preventive maintenance or an overhaul, a buffer stock h is built up from the instant when the rejection rate reaches a threshold level I(A) in order to ensure the continuous supply of the subsequent production line. Our objective is to determine simultaneously the optimal rates I(m)* and I(A)*, and the optimal size h* which minimize the expected total cost per time unit including the average costs related to maintenance, quality and inventory. (C) 2009 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available