4.7 Article

Pilot-scale nitrogen removal from leachate by ex situ nitrification and in situ denitrification in a landfill bioreactor

Journal

CHEMOSPHERE
Volume 101, Issue -, Pages 77-85

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.chemosphere.2013.12.030

Keywords

Landfill leachate; Nitrification; Real-time PCR; Denitrification; Landfill refuse

Funding

  1. National 863 Project of China [2006AA06Z327]
  2. Science and Technology Department of Zhejiang Province Project [2012C03001]

Ask authors/readers for more resources

A combined process consisting of ex situ nitrification and in situ denitrification in landfill refuse was studied in pilot scale for nitrogen removal from municipal landfill leachate. The results showed that above 80% of partial nitrification ratio and an average COD loading rate of 1.50 kg m(-3) d(-1) were steadily maintained under DO concentrations of 1.0-1.7 mg L-1 in the aerobic reactor. Quantitative PCR results indicated that nitrite-oxidizing bacteria being sensitive to DO fluctuations lead to partial nitrification when free ammonia inhibition was weak. Nitrified landfill leachate could be denitrified in the landfill bioreactor with maximum total oxidizing nitrogen removal rate of 67.2 g N t(-1) TSwaste d-1. Clone and sequencing analysis of denitrifying bacterial nirS gene inferred that heterotrophic denitrifier Azoarcus toluiyticu was the primary nitrogen converter in the landfill bioreactor. The obtained results will provide valuable information for optimizing the design and operation of a landfill bioreactor. (C) 2013 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available