4.5 Article Proceedings Paper

Enhanced stabilisation of sewage sludge through thermal hydrolysis - three years of experience with full scale plant

Journal

WATER SCIENCE AND TECHNOLOGY
Volume 42, Issue 9, Pages 89-96

Publisher

I W A PUBLISHING
DOI: 10.2166/wst.2000.0178

Keywords

agriculture; biogas; digestion; disintegration; sewage sludge; thermal hydrolysis

Ask authors/readers for more resources

The first full-scale plant for sludge disintegration through Cambi thermal hydrolysis was started up in Hamar, Norway at the end of 1995. It is the first plant with a new design where sludge is directly heated by live steam. During the last three years the plant worked with an availability of over 99%. Prior to hydrolysis the sludge is dewatered and the digester is fed with 10-12% DS, saving more than 50% of digester volume compared with a conventional process. The degree of stabilization is around 60% measured as rate COD-conversion into biogas. The stabilised sludge, which is guaranteed free of pathogens, is an attractive product to agriculture and has a high fertilizing effect.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available