4.7 Article

Machine scheduling with a rate-modifying activity

Journal

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Volume 128, Issue 1, Pages 119-128

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/S0377-2217(99)00066-1

Keywords

machine scheduling; job scheduling; rate-modifying activity; polynomial algorithms; performance measure

Ask authors/readers for more resources

Motivated by a problem commonly found in electronic assembly lines, this paper deals with the problem of scheduling jobs and a rate-modifying activity on a single machine. A rate-modifying activity is an activity that changes the production rate of the equipment under consideration. Hence the processing times of jobs vary depending on whether the job is scheduled before or after the rate-modifying activity. The decisions under consideration are when to schedule the rate-modifying activity and the sequence of jobs to optimize some performance measure. In this payer, we develop polynomial algorithms for solving problems of minimizing makespan, and total completion time respectively. We also develop pseudo-polynomial algorithms for solving problems of total weighted completion time under the agreeable ratio assumption. We prove that the problem of minimizing maximum lateness is NP-hard and also provide a pseudo-polynomial time algorithm to solve it optimally. (C) 2001 Elsevier Science B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available