4.6 Article Proceedings Paper

The cycle of instability: stress release and fissure flow as controls on gully head retreat

Journal

HYDROLOGICAL PROCESSES
Volume 15, Issue 1, Pages 3-12

Publisher

WILEY-BLACKWELL
DOI: 10.1002/hyp.150

Keywords

gully; hydrological modelling; stress release; pore-water pressure; preferential flow

Ask authors/readers for more resources

Gully head and wall retreat has commonly been attributed to fluvial scour and head collapse as a result of soil saturation, sapping or piping. The empirical evidence to substantiate these conceptual models is sparse, however, and often contradictory. This paper explores the hydrological and mechanical controls on gully head and wall stability by modelling the hydrology, stability and elastic deformation of a marl gully complex in Granada Province, southeast Spain. The hydrological and slope-stability simulations show that saturated conditions can be reached only where preferential fissure flow channels water from tension cracks into the base of the gully head, and that vertical or subvertical heads will be stable unless saturation is achieved. Owing to the high unsaturated strengths of marl measured in this research, failure in unsaturated conditions is possible only where the gully head wall is significantly undercut. Head retreat thus requires the formation of either a tension crack or an undercut hollow. Finite-element stress analysis of eroding slopes reveals a build up of shear stress at the gully head base, and a second stress anomaly just upslope of the head wall. Although tension cracks on gully heads have often been attributed to slope unloading, this research provides strong evidence that the so called 'sapping hollow' commonly found in the gully headwall base is also a function of stress release. Although further research is needed; it seems possible that 'pop out' failures in river channels may be caused by the same process. The hydrological analysis shows that, once a tension crack has developed, throughflow velocity in the gully headwall will increase by an order of magnitude, promoting piping and enlargement of this weakened area. It is, therefore, possible to envisage a cycle of gully expansion in which erosion, channel incision or human action unloads the slope below a gully head, leading to stress patterns that account for the tension crack and a stress-release hollow. The tension crack promotes faster throughflow, encouraging hollow enlargement and piping, which undercut the gully head. The tension crack permits the development of positive porewater pressures behind the gully head, leading either to failure or contributing to toppling. Finally the debris may be eroded by fluvial action, unloading a new section of slope and completing the cycle of gully head retreat. Copyright (C) 2001 John Wiley & Sons, Ltd.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available