Journal
PHYSICS AND CHEMISTRY OF THE EARTH PART B-HYDROLOGY OCEANS AND ATMOSPHERE
Volume 26, Issue 2, Pages 159-167Publisher
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/S1464-1909(00)00234-3
Keywords
-
Ask authors/readers for more resources
Three case-histories are aimed to show possibilities how to use results of dilatometric measurements of relative displacements on rock cracks to assess actual rock slope instability and to make time-predictions of a rock fall. The prediction of a collapse of a sandstone rock wall above an international road in the Northern Bohemia was made 2 months beforehand, and the critical 7-days time-window was met with 1-day precision. For an unstable sandstone cliff in the same geographic area, the beginning for the the final phase of a rock fall preparation was foreseen 1 year before. The prognosis of the month entailing immediate rock fall danger was made 5 months beforehand, and then proved using a monitoring method. The time series of a 2 years lasting monitoring enabled the long-time prognosis of rock falling activity from a limestone cliff in Austrian Alps, in 1990. At present time, the prognosis seems to become fulfilled in the next 2 years. These years are making the upper limit of its most probable time window. The needs to improve methods of the medium- and the longtime ranging prognostication to meet the majority of practical demands are briefly discussed. (C) 2000 Elsevier Science Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available