Technical assessment of fuel cell operation on anaerobic digester gas at the Yonkers, NY, wastewater treatment plant

Journal

WASTE MANAGEMENT
Volume 23, Issue 8, Pages 709-717

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/S0956-053X(02)00165-4

Keywords

-

Ask authors/readers for more resources

This paper summarizes the results of a 2-year field test to assess the performance of a specially modified commercial phosphoric acid 200-kW fuel cell power plant to recover energy from anaerobic digester gas (ADG) which has been cleansed of contaminants (sulfur and halide compounds) using a patented gas pretreatment unit (GPU). Specific project goals include characterization of the fuel cell power plant emissions and verification of the GPU performance for removing sulfur contaminants. To remove halide contaminants from the ADG, a halide guard, consisting of a vessel with a metal oxide supported on alumina, was incorporated into the fuel cell reactant supply. This first-of-a-kind demonstration was conducted at the Yonkers, NY, wastewater treatment plant, a sewage processing facility owned and operated by Westchester County. Results have demonstrated that the ADG fuel cell power plant can produce electrical output levels close to full power (200 kW) with negligible air emissions of CO, NOx, and SO2. The GPU removed virtually 100% of H2S and 88% of organic sulfur, bringing the overall sulfur removal efficiency of the GPU to over 99%. The halide guard removed up to 96% of the halides exiting the GPU. Published by Elsevier Ltd.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available