Predicting performance of design-build and design-bid-build projects

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2004)130:1(75)

Keywords

performance evaluation; design/build; project management; models

Ask authors/readers for more resources

Design-build (DB) and design-bid-build (DBB) are two principal project delivery systems used in many countries. This paper reports on models constructed to predict performance of DB and DBB projects on 11 areas, using project-specific data collected from 87 building projects. The study included collecting, checking, and validating industry data, and the statistical development of multivariate linear regression models for predicting project performance. Robust models are developed to predict construction and delivery speeds of DB and DBB projects. Gross floor area of the project is the most significant factor affecting speed. Besides this, for DBB projects, contractors' design ability, and adequacy of plant and equipment would ensure speedy completion of the projects. For DB projects, if the contract period is allowed to vary during tender evaluation, this would slow down the project. Robust models to predict turnover and system quality of DB projects are also constructed. A DB contractor's track record is an important variable. They must have completed past projects to acceptable quality and have ability in financial, health and safety management.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available