4.5 Article Proceedings Paper

Experience from 10 years of full-scale operation with enhanced biological phosphorus removal at Oresundsverket

Journal

WATER SCIENCE AND TECHNOLOGY
Volume 52, Issue 12, Pages 151-159

Publisher

I W A PUBLISHING
DOI: 10.2166/wst.2005.0451

Keywords

enhanced biological phosphorus removal; phosphorus removal; wastewater treatment; hydrolysis

Ask authors/readers for more resources

Ten years of full-scale experience with enhanced biological phosphorus removal (EBPR) has been evaluated. During the start-up period lack of carbon source was the main operational problem and a higher level of volatile fatty acids was secured by introducing a primary sludge hydrolysis. Acidic thermal sludge hydrolysis was used as the sludge treatment method at the plant during about three years. One effluent stream, rich in carbon and precipitant, was brought back to the process leading to an improvement of the phosphorus removal both by an improved biological process and chemical precipitation. A quite stable process of EBPR was developed with low levels of effluent phosphorus concentration. Stringent effluent discharge limits during short evaluation periods necessitated a continued work for improvement of the shortterm stability. During periods with lack of carbon, such as industrial holiday or rainy periods, both simultaneous precipitation and reduced aeration have been successfully tested as strategies for securing low levels of effluent phosphorus.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available