4.7 Article

Tactical planning of offshore petroleum production

Journal

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Volume 176, Issue 1, Pages 550-564

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2005.06.060

Keywords

decision support systems; petroleum production; integer programming

Ask authors/readers for more resources

This paper describes a model for tactical planning of Norwegian petroleum production. The problem involves regulation of production levels from wells, splitting of production flows into oil and gas products, further processing of gas and transportation in a pipeline network. Blending and processing of gas is necessary to satisfy quality requirements in the markets. The problem is formulated with multi-component flows, regulation alternatives in production, non-linear splitting for chemical processing and linear quality constraints on composite products. Production and splitting are modelled with integer requirements. The model is implemented in Xpress(MP) with a Visual Basic supported user interface in Excel. It is constructed in cooperation with the major Norwegian oil company, Statoil and can identify optimal production patterns and assist in planning of possible shut-downs, demonstrate system robustness to customers and aid in contract negotiations. (c) 2005 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available