Journal
BIORESOURCE TECHNOLOGY
Volume 98, Issue 1, Pages 118-129Publisher
ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2005.11.009
Keywords
2-chlorophenol (2-CP); 2,4-dichlorophenol (2,4-DCP); upflow anaerobic sludge blanket (UASB); rotating biological contactor (RBC)
Ask authors/readers for more resources
Combination of upflow anaerobic sludge blanket (UASB) and aerobic rotating biological contactor (RBC) reactors having higher biomass concentration and higher sludge retention time (SRT) was applied for the sequential treatment of priority pollutant chlorophenol containing wastewater. Target compounds 2-chlorophenol (2-CP) and 2,4-dichlorophenol (2,4-DCP) present in two simulated waste-waters at a concentration of 30 mg/l each individually were sequentially treated in continuous mode by combined UASB-I, RBC-I and combined UASB-II, RBC-II reactors, respectively after the acclimation of their biomass with the corresponding chlorophenol. Reactor combinations took 190 and 215 days for acclimation with 30 mg/l of 2-CP and 2,4-DCP respectively. Hydraulic retention time (HRT) studies showed that 12 h HRT of UASB-I and 23 h HRT of RBC-I as well as 12 h HRT of UASB-II and 28.8 h HRT of RBC-II were the optimum combinations for the treatment of simulated wastewater containing 2-CP and 2,4-DCP respectively. Optimum HRT combinations produced 2-CP and 2,4-DCP effluent having corresponding chlorophenol concentration of below detectable limit (BDL) and 0.1 mg/l respectively. Half velocity coefficients (K,) for 2-CP and 2,4-DCP biodegradation in UASB reactors were determined to be 5.07 mg 2-CP/l and 6.49 mg 2,4-DCP/l. Optimum ratio of substrate (chlorophenol): co-substrate (sodium acetate) was 1:100. (c) 2005 Elsevier Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available