3.8 Article

Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

Journal

JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING
Volume 14, Issue 2, Pages 161-+

Publisher

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/13552510810877665

Keywords

Lot size; Preventive maintenance; Quality; Inventory

Ask authors/readers for more resources

Purpose - The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items. Design/methodology/approach - The proposed integrated policy is defined and modeled mathematically. Findings - The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications - The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality-and inventory-related costs is shown through a numerical example. Originality/value - The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory-and quality-related costs.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available