4.5 Article

In situ measurements of cemented paste backfill at the Cayeli Mine

Related references

Note: Only part of the references are listed.
Article Engineering, Geological

Coupled two-dimensional finite element modelling of mine backfilling with cemented tailings

Matthew Helinski et al.

CANADIAN GEOTECHNICAL JOURNAL (2010)

Article Environmental Sciences

Composite paste barricade performance at Goldcorp Inc. Red Lake Mine, Ontario, Canada

P. B. Hughes et al.

INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT (2010)

Article Engineering, Geological

An analytical solution for the nonlinear distribution of effective and total stresses in vertical backfilled stopes

Li Li et al.

GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL (2010)

Article Engineering, Geological

Horizontal pressure on barricades for backfilled stopes. Part II: Submerged conditions

Li Li et al.

CANADIAN GEOTECHNICAL JOURNAL (2009)

Article Engineering, Geological

Horizontal pressure on barricades for backfilled stopes. Part I: Fully drained conditions

Li Li et al.

CANADIAN GEOTECHNICAL JOURNAL (2009)

Article Engineering, Geological

Direct measurement of matric suction in triaxial tests on early-age cemented paste backfill

Paul Simms et al.

CANADIAN GEOTECHNICAL JOURNAL (2009)

Article Engineering, Geological

Assessment of the self-desiccation process in cemented mine backfills

Matthew Helinski et al.

CANADIAN GEOTECHNICAL JOURNAL (2007)

Article Engineering, Geological

Numerical Modeling of cemented mine backfill deposition

Matthew Helinski et al.

JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING (2007)

Article Engineering, Geological

The influence of temperature on earth pressure cell readings

L Daigle et al.

CANADIAN GEOTECHNICAL JOURNAL (2004)