PRELIMINARY FIELD TESTS AND LONG-TERM MONITORING AS A METHOD OF DESIGN RISK MITIGATION: A CASE STUDY OF GDANSK DEEPWATER CONTAINER TERMINAL

Journal

POLISH MARITIME RESEARCH
Volume 24, Issue 3, Pages 106-114

Publisher

GDANSK UNIV TECHNOLOGY
DOI: 10.1515/pomr-2017-0095

Keywords

monitoring; field test; Observational Method; CFA piles; micropiles; geotechnics

Ask authors/readers for more resources

Appropriate risk assessment plays a fundamental role in the design.. The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called Observational Method (OM) can produce savings in costs and programmes on engineering projects without compromising safety. The case study presented is a complex design solution that deals with the heavy foundations of a gantry crane beam as one of the elements of a Deepwater Container Terminal extension. The paper presents a detailed process of the design of the rear crane beam being a part of the brand new berth, together with its static analysis, as well as the long-term results of observations, which have revealed the real performance of the marine structure. The case presented is based on excessive preliminary field tests and technical monitoring of the structure, and is an example of a successful OM implementation and design risk mitigation.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.2
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available