3.9 Article

Evaluation of power plants to prioritise the investment projects using fuzzy PROMETHEE method

Journal

INTERNATIONAL JOURNAL OF SUSTAINABLE ENERGY
Volume 37, Issue 10, Pages 941-955

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/14786451.2017.1366489

Keywords

Multi-criteria decision-making; fuzzy PROMETHEE II; fuzzy TOPSIS; analytical network process

Categories

Ask authors/readers for more resources

Increasing population growth of Iran, and consequently, increasing the annual energy consumption has made the construction of more than 3000 MW power plant necessary. Taking into account various criteria, some power plants have been evaluated and ranked to select the most appropriate power plant for investment. For this purpose, three aspects and seven main criteria for evaluating power plants have been determined. Afterward, weights of sub-criteria have been determined by Analytical Network Process method, and eventually, power plants have been ranked by a multi-criteria decision-making (MCDM) method (i.e. fuzzy PROMETHEE II). Moreover, a comprehensive sensitivity analysis has been carried. Finally, power plants have been ranked by fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method once again. Since the value of Spearman Correlation Test for two implemented methods is equal to 0.98, it can be concluded that fuzzy PROMETHEE II performs as well as fuzzy TOPSIS in ranking alternatives.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.9
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available