Journal
JOURNAL OF COMPUTATIONAL DESIGN AND ENGINEERING
Volume 5, Issue 2, Pages 160-172Publisher
ELSEVIER
DOI: 10.1016/j.jcde.2017.11.008
Keywords
Symbiotic organisms search; Multi-objective analysis; Resource tradeoff; Schedules; Repetitive
Funding
- University of DaNang [B2016-DN02-09]
Ask authors/readers for more resources
Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called opposition multiple objective symbiotic organisms search (OMOSOS) for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1) to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. (C) 2017 Society for Computational Design and Engineering. Publishing Services by Elsevier.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available