4.7 Article

Dispatching rules for scheduling in assembly jobshops - Part 2

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 38, Issue 10, Pages 2349-2360

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540050028133

Keywords

-

Ask authors/readers for more resources

In this part of the paper, we present the development and evaluation of dispatching rules for scheduling in jobshops manufacturing multi-level assembly jobs with the performance measures reated to tardiness. We present a new definition of 'operation due date' in the context of assembly jobs and use it in the development of dispatching rules. A simulation study is carried out to evaluate the performances of the existing and the proposed dispatching rules with respect to different measures of tardiness. We also measure their performances with respect to different measures of flowtime and staging delays. The results of the study indicate that the proposed rules perform better than the existing rules.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available