4.6 Article

Hybrid flow-shop scheduling with assembly operations

Journal

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
Volume 73, Issue 2, Pages 103-116

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/S0925-5273(00)00169-9

Keywords

flow shop; scheduling; assembly operations; branch and bound

Ask authors/readers for more resources

Hybrid scheduling for the production system including parts machining and assembly operations is studied. Several products of different kinds are ordered to be produced and parts for the products are manufactured in the flow-shop consisting of multiple machines. Each product is produced by hierarchical assembly operations from the parts. Several parts are assembled into the first sub-assembly, and several other parts and the first sub-assembly are assembled into the second sub-assembly. These assembly operations are continued until the last sub-assembly that is the final product is obtained. In this paper, the problem to obtain a schedule having the minimum weighted sum of completion time of each product is considered. The decision variables are the sequence of products to be assembled and the sequence of parts to be processed. A technique to get better lower bounds and a calculation procedure using branch and bound method is developed to obtain an optimum or e-optimum. schedule. The meaning of the model is demonstrated by a numerical example and the effectiveness of the proposed calculation procedure is shown by several computational experiments. (C) 2001 Elsevier Science B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available