4.7 Article

Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints

Journal

AUTOMATION IN CONSTRUCTION
Volume 35, Issue -, Pages 431-438

Publisher

ELSEVIER
DOI: 10.1016/j.autcon.2013.05.030

Keywords

Multi-mode scheduling; Ant colony optimization; Renewable and nonrenewable resource constraints; Construction projects

Funding

  1. National Natural Science Foundation of China [71071099]

Ask authors/readers for more resources

An ant colony optimization (ACO)-based methodology for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) considering both renewable and nonrenewable resources is presented. With regard to the MRCPSP solution consisting of activity sequencing and mode selection, two levels of pheromones are proposed to guide search in the ACO algorithm. Correspondingly, two types of heuristic information and probabilities as well as related calculation algorithms are introduced. Nonrenewable resource-constraint and elitist-rank strategy are taken into account in updating the pheromones. The flowchart of the proposed ACO algorithm is described, where a serial schedule generation scheme is incorporated to transform an ACO solution into a feasible schedule. The parameter-selection and the resultant performance of the proposed ACO methodology are investigated through a series of computational experiments. It is expected to provide an effective alternative methodology for solving the MRCPSP by utilizing the ACO theory. (C) 2013 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available