Journal
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
Volume 74, Issue 1-3, Pages 93-101Publisher
ELSEVIER SCIENCE BV
DOI: 10.1016/S0925-5273(01)00110-4
Keywords
scheduling; parallel processors; switching times; industrial production system
Ask authors/readers for more resources
An aluminium can production problem is considered and restated as a problem of scheduling unrelated parallel machines with sequence-dependent changeover times. The objective is to find the minimal cost schedule that respects a given production horizon. As this time constraint can be very difficult to meet, a bicriterion procedure is proposed to deal with the respect of the production horizon and the minimization of the set of costs (production, distribution, switchings). (C) 2001 Elsevier Science BN. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available