4.7 Article

Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming

Journal

AUTOMATION IN CONSTRUCTION
Volume 20, Issue 5, Pages 571-580

Publisher

ELSEVIER
DOI: 10.1016/j.autcon.2010.11.023

Keywords

Optimization of tower crane location; Optimization of material supply locations; High-rise building construction site; Mixed-integer-linear programming

Funding

  1. City University of Hong Kong [7008031]

Ask authors/readers for more resources

Facility layout design and planning within construction sites are a common construction management problem and regarded as a complex combinatorial problem. To transport heavy materials, tower cranes are needed and should be well located to reduce operating costs and improve overall efficiency. Quadratic assignment problem (QAP), non-linear in nature, has been developed to simulate the material transportation procedure. Applying linear constraint sets, the quadratic problem can be linearized and the problem could be formulated into a mixed-integer-linear programming (MILP) problem solvable by a standard branch-and-bound technique for true optimal results. Numerical findings show that MILP results outperform those optimized by Genetic Algorithms with almost 7% on improving the objective function values in which facilities and locations can be modeled using integer variables. To demonstrate the design flexibility of using MILP formulation, the problem is also extended to non-homogeneous storages where different materials can be stored at a single supply point. (C) 2010 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available