4.7 Article

Entropy-based scheduling of resource-constrained construction projects

Journal

AUTOMATION IN CONSTRUCTION
Volume 18, Issue 7, Pages 919-928

Publisher

ELSEVIER
DOI: 10.1016/j.autcon.2009.04.007

Keywords

Resource-constrained construction; scheduling; Entropy

Ask authors/readers for more resources

A method is presented for resource allocation and scheduling of resource-constrained projects by use of a measure of the projects' entropy. The entropy, as a measure of the degree of disorder in a system, is an indicator of a project's tendency to progress out of order and into a chaotic condition and it can thus serve to forecast a project's development. The entropy metric used in the analysis is based on the resource assignments per activity (required vs. assigned resource units). (C) 2009 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available