4.7 Article

A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 40, Issue 6, Pages 1405-1420

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540110116273

Keywords

-

Ask authors/readers for more resources

This work presents a new mathematical programming model for the mixed-model assembly line balancing problem with parallel workstations and zoning constraints. It allows the user to control the process to create parallel workstations. The model's primary goal is to minimize the number of workstations along the line, for a given cycle time, and its secondary goal is to balance the workloads between and within workstations. A two-stage procedure, using a simulated annealing approach, was developed to tackle this complex problem. The first stage of the procedure looks for a sub-optimal solution to the problem's primary goal, whilst the second stage deals with the secondary goal. The procedure is illustrated with a numerical example and the results from computational experiments show that even for large-scale problems the proposed procedure performs very well.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available