New factors for capital cost estimation in evolving process designs

Journal

CHEMICAL ENGINEERING RESEARCH & DESIGN
Volume 80, Issue A6, Pages 579-586

Publisher

INST CHEMICAL ENGINEERS
DOI: 10.1205/026387602760312773

Keywords

capital cost estimation; plant costs; equipment costs; factored estimates; Lang factor

Ask authors/readers for more resources

Capital cost assessment is an integral part of an evolving process design. The assessment should consider installed equipment costs inclusive of plant bulk items and not solely purchased equipment costs. The ratio of installed equipment cost to purchased equipment cost varies much more widely for individual equipment items than for entire plants; the ratio depends on equipment class, design, size and construction materials as well as plant layout. The factored (IChemE) method outlined in the Institution of Chemical Engineers 'blue booklet' is of immediate use and provides a basis for checking detailed estimates. Some experience in the application of the IChemE method by the authors is reviewed. Recommendations are made for broadening the inputs for estimating, and some factors are proposed for estimating installed costs of equipment of different classes. Quantitative data are also presented for cost breakdown in entire plants arising from project reviews by the authors.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available