4.5 Article

Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process

Journal

COMPUTERS & OPERATIONS RESEARCH
Volume 29, Issue 12, Pages 1701-1717

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/S0305-0548(01)00051-X

Keywords

inventory; quality improvement; setup cost reduction; lead-time reduction; minimax distribution-free procedure

Ask authors/readers for more resources

This paper investigates the lot size, reorder point inventory model involving variable lead time with partial backorders, where the production process is imperfect. The options of investing in process quality improvement and Setup cost reduction are included, and lead time can be shortened at an extra crashing cost. The objective is to simultaneously optimize the lot size, the reorder point, the process quality. the setup cost, and the lead time. We first assume that lead-time demand follows a normal distribution and develop an algorithm to find the optimal solution. Then, we relax the assumption of normality to consider a distribution-free case where only the mean and standard deviation of lead-time demand are known. We apply the minimax distribution-free procedure to solve this problem. Furthermore. two numerical examples are given to illustrate the results.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available