Time for development of internal erosion and piping in embankment dams

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)1090-0241(2003)129:4(307)

Keywords

pipes; erosion; dams; embankment; dam failure; monitoring

Ask authors/readers for more resources

A method is presented for the approximate estimation of the time for progression of internal erosion and piping, and development of a breach leading to failure in embankment dams and their. foundations. The method accounts for the nature of the soils in the dam core, the foundation, and the materials in the downstream zone of the dam. Guidance is also provided on the delectability of internal erosion and piping, taking account of the mechanism of initiation, continuation, and progression to form a breach, for internal erosion and piping in the embankment, the foundation and from the embankment to foundation. It is shown that in many dams which have poor internal erosion and seepage control and are constructed mainly of earthfill, the time for potential development of piping is short, and for these dams continuous monitoring of seepage or surveillance would be needed to detect the piping in time to: give warning of possible failure, and to give time to attempt intervention to prevent the failure.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available