4.6 Article

Project ranking in the Armenian energy sector using a multicriteria method for groups

Journal

ANNALS OF OPERATIONS RESEARCH
Volume 120, Issue 1-4, Pages 135-157

Publisher

SPRINGER
DOI: 10.1023/A:1023330530111

Keywords

multiple criteria analysis; project ranking; group decision making

Ask authors/readers for more resources

Project ranking is a complex problem that is often faced by the decision makers involved in the planning process. The necessity to take into account several decision parameters apart from purely economic ones, such as socio-political, technical, institutional and environmental, lead to the use of multicriteria methods instead of single uni-criterion ones. Moreover, most of the times such decisions are taken in a group environment. A hybrid of ELECTRE III and PROMETHEE methods, MURAME, has been specially developed and constitutes the main part of an integrated project ranking methodology for groups. The experience of the application of the methodology in the Armenian energy sector is presented.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available