4.5 Article

Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows

Journal

OPERATIONS RESEARCH
Volume 51, Issue 3, Pages 487-502

Publisher

INST OPERATIONS RESEARCH MANAGEMENT SCIENCES
DOI: 10.1287/opre.51.3.487.14949

Keywords

-

Ask authors/readers for more resources

In this paper a new time-oriented decomposition heuristic is proposed to solve the dynamic multi-item multilevel lot-sizing problem in general product structures with single and multiple constrained resources as well as setup times. While lot-sizing decisions are made sequentially within an internally rolling planning interval (or lot-sizing window), capacities are always considered over the entire planning horizon. For each submodel a model formulation based on the Simple Plant Location representation is developed. These mixed-integer linear submodels are solved by standard mathematical programming software even for relatively large test instances. Extensive computational tests show that the heuristic proposed provides a better solution quality than a well-known special purpose heuristic.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available