4.8 Article

New start-up schemes for isolated full-bridge boost converters

Journal

IEEE TRANSACTIONS ON POWER ELECTRONICS
Volume 18, Issue 4, Pages 946-951

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPEL.2003.813758

Keywords

coupled-inductor; dc/dc; full-bridge; isolated boost converter; start-up scheme

Ask authors/readers for more resources

Two new start-up schemes for isolated full-bridge boost converters are proposed in this paper. The control,timing for each scheme, which,is compatible with pulse-width modulated (PWM) control timing for normal boost mode operation, are investigated. Design considerations on the relationship between the turns ratios of the boost choke windings and the main transformer windings, and its effects on the operation of the converter, are studied. The two proposed start-up schemes area experimentally verified on a 1.6 kW, 12 V/288 V prototype.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available