4.7 Article

Experimental analysis of a high-speed railway bridge under Thalys trains

Journal

JOURNAL OF SOUND AND VIBRATION
Volume 268, Issue 1, Pages 103-113

Publisher

ACADEMIC PRESS LTD- ELSEVIER SCIENCE LTD
DOI: 10.1016/S0022-460X(03)00202-5

Keywords

-

Ask authors/readers for more resources

In this paper dynamic experiments on the Antoing Bridge located on the high-speed railway line between Paris and Brussels are reported. The experiments were co-operatively carried out by the Northern Jiaotong University from China, the Catholic University of Leuven, the Free University of Brussels and the Belgium Railway Company NMBS-SNCB from Belgium. The bridge is composed of multi-span simply supported PC girders with spans of 50 in and U-shaped sections. The loads are the high-speed Thalys trains with articulated vehicles. The speeds of the Thalys trains were between 265 and 310 km/h. In the experiments, the dynamic responses of the bridge such as the deflections, the accelerations and the strains that were measured by a laser velocity displacement transducer accelerometers and strain gauges, respectively. Many useful results have been obtained from the analysis of the recorded data. The tests and the measured results can be a reference for the study and the design of high-speed railway bridges. (C) 2003 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available