4.5 Article

Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics

Related references

Note: Only part of the references are listed.
Article Computer Science, Artificial Intelligence

The development of a sub-population genetic algorithm II (SPGA II) for multi-objective combinatorial problems

Pei-Chann Chang et al.

APPLIED SOFT COMPUTING (2009)

Article Engineering, Industrial

Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times

S. Hamed Hendizadeh et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)

Article Engineering, Industrial

Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion

Adam Janiak et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2007)

Article Mathematics, Applied

An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times

M. Zandieh et al.

APPLIED MATHEMATICS AND COMPUTATION (2006)

Article Computer Science, Interdisciplinary Applications

Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups

R Logendran et al.

COMPUTERS & OPERATIONS RESEARCH (2006)

Article Computer Science, Artificial Intelligence

Two-phase sub population genetic algorithm for parallel machine-scheduling problem

PC Chang et al.

EXPERT SYSTEMS WITH APPLICATIONS (2005)

Article Computer Science, Interdisciplinary Applications

Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups

PM França et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2005)

Article Computer Science, Theory & Methods

A new approach to solve hybrid flow shop scheduling problems by artificial immune system

O Engin et al.

FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE (2004)

Article Computer Science, Interdisciplinary Applications

Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints

H Allaoui et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2004)

Article Management

Scheduling flexible flow lines with sequence-dependent setup times

ME Kurz et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)

Article Computer Science, Interdisciplinary Applications

Heuristics for hybrid flow shops with controllable processing times and assignable due dates

JND Gupta et al.

COMPUTERS & OPERATIONS RESEARCH (2002)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)

Article Engineering, Industrial

Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness

V Botta-Genoulaz

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2000)

Article Engineering, Industrial

A branch-and-bound algorithm for the hybrid flowshop

O Moursli et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2000)